During the call, Sempra Energy announced they made $2.9 billion in 2022. THERE ARE SOME OTHER PROJECTS BEING DISCUSSED ON HOLD AT THIS TIME, NAMELY THE PORT ALBANY OFFSHORE WIND TURBINE MANUFACTURING & GLOBAL FOUNDRIES (CHIP PLANT). THE WORK LOOKS VERY PROMISING FOR THE NEXT COUPLE OF YEARS WITH A NEW ABHOR RENEWABLE GAS PLANT, A NEW AMMONIA PLANT & A VERY LARGE EXPANSION AT CHEVRON IN ORANGE. THE PROJECT HAS STARTED & CONTRACTOR WILL BE PLACING MANPOWER CALLS AS NEEDED. WORKS LOOKS GOOD GOING INTO SPRING & LOTS OF WORK SCHEDULED GOING INTO THE NEW YEAR. MOST OF THE WORK IS AT ADM WITH NEW BUILDINGS & MODIFICATIONS TO EXISTING PLANTS. PROJECTS INCLUDE HOSPITAL, COMMERICAL & SOME MILITARY WORK. DL SMITH WAS SUCESSFUL ON THE DOCKING BUILDING IN TOPEKA, BUT IT IS HIGHLY DOUBTFUL THEY WILL BE HIRING ANYTIME SOON. THERE IS AN APPLICATION & A FEE OF $50 TO TAKE THE EXAM WITH THE LICENSE ITSELF COSTING $200. BMWC HAS BEEN AWARDED PROJECT AT THE ALCOA/KAISER FACILITY IN NEWBURGH. WORK IS EXPECTED TO BE GOOD IN KC AREA & WILL BE NEEDING HELP FROM TRAVELING BROTHERS & SISTERS IN THE SPRING OF 2023. THERE IS A 1.2 BILLION DOLLAR COMBINED CYCLE NATURAL GAS POWER PLANT LOCATED IN LORDSTOWN, OH STARTING IN THE SPRING OF 2023. CALL HALL FOR DETAILS.LOCAL HAS A WEBSITE THAT LINKS TO ALL JOBS IN WISCONSIN-THE LINK IS : #WI_IBEWjobs(6-30), JOBLINE - (423) 892-6482 OR (800) 423-9175, WORK IS STILL SLOW IN THE JURISDICTION. GM SPRINGHILL JOB IS ONGOING & STILL MANNING UP. PLEASE REVIEWALLUPDATES ON OUR WEBSITE AT IBEW6.ORG BEFORE TRAVELING HERE.PROJECTS HAVE BEEN IMPACTED HEAVILY BY COVID-19.IT IS BEING HIGHLY RECOMMEDED BY THE LOCAL THAT ALL MEMBERS GET FULLY VACCINATED WITH TWO SHOTS AND A BOOSTER BEFORE PLANNING TO WORK IN SAN FRANCISCO. IT IS UNDER THE NATIONAL CONSTRUCTION AGREEMENT WORKING 6-8'S PAYING $43.56 & HAS PERSONAL SICK DAYS FOR EVERY 30 HRS WORKED. MUST SIGN IN PERSON INITIALLY & RESIGN BY FAX FROM YOUR HOME LOCAL OR ON LOCALS WEBSITE. INTEL HAS BEEN A LITTLE SLOW AS OF LATE. CALL HALL FOR DETAILS.MOST CALLSREQUIRE A STATE LICENSE OR A STATE CERT (CA) OR TRAINEE CARD. LOCAL WAITING ON INFORMATION ON SUBSTATION WORK SCHEDULED FOR THE SPRING. NOT ANTICIPATING GETTING INTO BOOK 2 ANYTIME SOON. CALL THE JOBLINE OR CHECK JOB BOARD (ibew379.org. ORIGINAL SIGN IS IN PERSON. UA 63 Welder: LOCAL WILL BE EXTREMELY BUSY GOING INTO THE 2ND QUARTER OF THE YEAR & WILL NEED PLENTY OF HELP FROM OUT TRAVELING BROTHERS/SISTERS. FONTAINEBLEAU AND MSG SPHERE WILL NOT OPEN UNTIL SUMMER/FALL OF 2023. LOCAL IS HOLDING IT'S OWN AT THIS TIME. NEW KCI TERMINAL IS ONGOING & SCHEDULED TO OPEN IN EARLY SPRING 2023. NO REALLY LARGE PROJECTS, BUT CALLS HAVE BEEN STEADY. UNFILLED CALLS FOR KIEWIT AT THE YELLOWBUD SOLAR PROJECT NEAR CHILLICOTHE, OH. CALL HALL FOR DETAILS. COMMERCIAL WORK INCLUDES NEW HIGH SCHOOLS, WORK AT A NEW PHARMACEUTICAL PLANT, AND A CASINO THAT JUST BROKE GROUND. THE COURTHOUSE IS STILL ONGOING, STATE PROJECT IN DOWNTOWN SACRAMENTO THAT IS FOUR 10 STORY BUILDINGS WITH A LARGE PARKING STRUCTURE. THERE ARE 2 SOLAR PROJECTS THAT HAVE WAIVED THE STATE LICENSE. RESIGN IS THE 10TH-16TH OF EACH MONTH AND CAN BE DONE BY WEBSITE, EMAIL, FAX OR PHONE. TAFT ELECTRIC HAS STARTED NEW HIGH SCHOOL PROJECT THAT SHOULD START HIRING IN FEBRUARY. HARRAH'S/CAESAR'S HOTEL TOWER HAS BEEN AWARDED TO FRISCHHERTZ ELECTRIC, BUT HASN'T BROKE GROUND YET. HOPE TO PICK UP GOING INTO THE SUMMER MONTHS.ALL CALLS REQUIRE A STATE OF TEXAS ELECTRICAN LICENSE BUT AN APPRENTICE LICENSE CAN BE PURCHASED. STILL AN ENORMOUS AMOUNT OF WORK COMING INTO THE AREA. MEMORIAL HOSPITAL IS STALLED DUE TO MECHANICAL MATERIAL COMPLICATIONS, HOPEFULLY SPRING START. THERE ARE A COUPLE OF LARGE SOLAR FIELDS THAT WILL NEED HELP OVER THE NEXT SEVERAL MONTHS. OTHER UPCOMING WORK INCLUDES 2 SOLAR SITES, 2 NEW SCHOOLS, VARIOUS WASTE WATER PROJECTS & A LOT OF COMMERCIAL WORK IN THE AREA. THERE IS A LICENSE REQUIREMENT FOR MUCH OF THE WORK, BUT LOCAL WILL ASSIST ANY BROTHER OR SISTER IF THEY CAN. THE TWO PROJECTS COMBINED EQUAL OVER 300 MW WITH BATTERY STORAGE AS WELL. CALL HALL FOR DETAILS.(5-5), DEFINED CONTRIBUTION PENSION (8%) & ANNUITY (5%), OPEN JOB CALLS WORKING AT LOCAL AREA MINES, MUST HAVE MSHA. JOBS AT RAYTHEON, MUST HAVE ORIGINAL BIRTH CERTIFICATE. WORKING 5-10S. NO STATE LICENSE REQUIRED.(9-20), DEFINED ($7.11) & CONTRIBUTION PENSION ($3.87), LOCAL HAS BEEN STAYING BUSY WITH THE ULTIUM CELLS BATTERY PLANT. THERE ARE MULTIPLE CONTRACTORS ONSITE INCLUDING LAKE ERIE ELECTRIC, CONTI, VEC, DICKEY ELECTRIC, GEM, HUNT/LIGHTHOUSE, T SQUARED& ELECTRICAL INSIGHTS. CALL HALL FOR DETAILS.(11-22), DEFINED ($5.49) & CONTRIBUTION PENSION ($3.36), WORK IS STILL SLOW IN THE AREA. THIS PROJECT IS SCHEDULED TO START APRIL/MAY OF 2023 & HAS A CONSTRUCTION VALUE OF 1.2 BILLION DOLLARS. EXPECTED TO NEED HELP FROM TRAVELING BROTHERS & SISTERS.SOME CALLS REQUIRE A STATE LICENSE. ANTICIPATED TO START UP AGAIN GOING INTO JULY OR AUGUST OF THIS YEAR. BELTLINE ELECTRIC & PETROTECH ALSO HAVE JOBS AT TVA COLBERT, CT. CALLS ARE COMING IN REGULARLY WITH PROJECT WORKING 6-10'S. SOME OF THESE PROJECT'S AT ULTIUM CELLS WILL BE ANOTHER 12+ MONTHS. (12-10), WORK IS STILL GOOD IN THE AREA. AMAZON DISTRIBUTION CENTER NOW WORKING 40 HRS WITH TRI CITY AS THE CONTRACTOR. THERE IS A OUTAGE AT PLANT HATCH COMING UP IN JANUARY AS WELL AS SOME WORK COMING AT THE GEORGIA PORTS.CALL HALL FOR DETAILS. WORK IN THE AREA INCLUDES COMMERICIAL, SERVICE & INDUSTRIAL PROJECTS . LOCAL HAS SEVERAL DECENT SIZED PROJECTS GOING INTO 2023, BUT NOT LIKELY TO GET INTO BOOK 2 UNTIL THEN. THE SUN ZIA PROJECT IS SCHEDULED TO START IN JUNE THAT CONSISTS OF PARALLEL 500 KVA TRANSMISSION LINE GOING TO PHOENIX & IS ESTIMATED TO BE OVER 600 MILES OF LINE. FACEBOOK HAD A BIG TURNAROUND DUE TO REDESIGN ISSUES. (11-30), GRAND GULF NUCLEAR STATION SHUTDOWN. THIS IS A 40-50 MILLION DOLLAR PROJECT WITH , 50-60 WIREMEN WORKING 5-10'S & AN 8 ON SATURDAYS. SEVERAL BOOK 2 HAVE BEEN DISPATCHED OVER THE PAST COUPLE OF MONTHS AT AN ONGOING ZINC RECOVERY (WSP) PLANT IN LOGANSPORT 30 MINS NORTH OF LAFAYETTE. A REGISTERED LICENSE CAN BE PURCHASED THROUGH THE STATE OF WI AT THE FOLLOWING LINK (OR SEE ATTACHED) FOR $35.00:https://dsps.wi.gov/Pages/Professions/ElectricianRegistered/Default.aspx, BROTHERS & SISTERS CAN STAY UPDATED BY CHECKING WEBSITE(www.ibew890.org), OR THE LOCALS FACEBOOK PAGE (IBEW LOCAL 890) OR CALL LOCAL'S JOBLINE. PROJECT IS WORKING MANDATORY 7-10'S AND JOB EXPECTED TO BE WINDING DOWN BY NOVEMBER 1ST. THE REFINERY IS ALSO EXPECTED TO MAN UP GOING INTO THE NEW YEAR, THERE IS MORE SOLAR WORK IN THE DOCKET & HERSHEY PLANT IN ROBINSON HAS A GOOD SIZED PROJECT AS WELL. THE TSMC CHIP PLANT IS PAYING $5.00 OVERSCALE & WORKING 60/60/50 HR/WEEK SCHEDULE. AWAITING ANNOUNCMENT OF BATTERY PLANT, ANTICIPATING SPRING START. THE LOCAL CONTINUES TO HAVE OPPORTUNTIES FOR RESIDENTIAL, LOW VOLTAGE, SOLAR & MOST ASPECTS OF OUR TRADE.OREGON STATE LICENSE REQUIRED & IS RECIPROCAL WITH WASHINGTON, ARKANSAS, IDAHO, MAINE, MONTANA, UTAH & WYOMING. STEEL IS GOING UP FOR THE 1ST BUILDING ALONG WITH CONTINUED DUCT BANK WORK. SCALE = $37.18. MORE CALLS FOR FREEMAN ANTICIPATED FOR THE 2ND WEEK OF JAN ATTHE WYLIE WATER TREATMENT PLANT. GREAT ARROW BUILDERS (BECHTEL) IS THE GENERAL CONTRACTOR WORKING UNDER THE NATIONAL CONSTRUCTION AGREEMENT. HUSTON ELECTRIC PICKED UP THE HYPERSONIC AIR RESEARCH FACILITY (HARF) PROJECT IN PURDUE. CONTACT THE HALL FOR DETAILS., NEW PAPER MACHINE PROJECT IS COMPLETE & THE LOCAL WANTS TO THANK ALL THE OVER 600 TRAVELING BROTHERS & SISTER THAT HELP COMPLETE THAT WORK. CALL HALL FOR DETAILS.(12-10), SCALE = $83.25($84.50 EFFECTIVE 1/1/2023), DEFINED ($12.02) & CONTRIBUTION PENSION ($8.50), H&W = $18.08($18.33 EFFECTIVE 1/1/2023), WORK IS SLOW IN THE AREA WITH FEW CALLS AVAILABLE. PARTS OF PREFAB ARE WORKING 5-10'S & 8 ON SATURDAYS. SACHS HAS PUT IN CALLS FOR PRE-OUTAGE WORK BEFORE THE SHUTDOWN & IS EXPECTED TO HIRE MORE BEFORE IT BEGINS. (11-30), 6% VAC ON TOP OF CHECK, WORK IS STILL STEADY & AT FULL EMPLOYMENT. JOB IS WORKING 5-10'S & SATURDAYS.LOS ALAMOS NATIONAL LABORATORY IS STILL GOING STRONG. JOB WORKING 5-10'S & 1-8'S. LOOKS TO BE BUSY GOING INTO NEXT YEAR. PROJECT WORKING 5-10'S & EXPECTED TO LAST ANOTHER 2 YEARS WITH NEW PAINT SHOP, NEW BATTERY PLANT AND ONGOING WORK INSIDE THE PLANT. THE MPEC CENTER IN CLARKSVILLE WORKING 4-10'S W/POSSIBLE OVERTIME. THERE IS ALSO A GM PLANT IN MARION THAT IS INVESTING $480 MILLION TO INSTALL NEW PRESSES. PLEASE REVIEWALLUPDATES ON OUR WEBSITE AT IBEW6.ORG BEFORE TRAVELING HERE.PROJECTS HAVE BEEN IMPACTED HEAVILY BY COVID-19.IT IS BEING HIGHLY RECOMMEDED BY THE LOCAL THAT ALL MEMBERS GET FULLY VACCINATED WITH TWO SHOTS AND A BOOSTER BEFORE PLANNING TO WORK IN SAN FRANCISCO. NO WORK AT DATA CENTER IN PRYOR UNTIL SOMETIME IN 2022. CALL HALL FOR DETAILS. (1-7), THE $650 MILLION DOLLAR PBF REFINERY IN CHALMETTE EXPANSION EXPECTED TO LAST UP TO 18 MONTHS ONCE IT STARTS. WORKS LOOKS GOOD GOING INTO SPRING & LOTS OF WORK SCHEDULED GOING INTO THE NEW YEAR. TAFT ELECTRIC HAS STARTED NEW HIGH SCHOOL PROJECT THAT SHOULD START HIRING IN FEBRUARY. ALL THESE JOBS ARE CURRENTLY IN THE PROCESS OF CIVIL WORK & UNDERGROUND ONGOING. NOT EXPECTED TO GET INTO BOOK 2 THROUGH THE WINTER MONTHS. SCHEDULES ARE ALIGNING WITH THIS OUTAGE TO FINISH UP SO A MEMBER COULD GO RIGHT INTO ANOTHER OUTAGE OUT OF BEAVER, PA IN LU-12. WINTER MONTHS EXPECTED TO STAY FAIRLY QUIET, BUT ANTICIPATED TO PICK UP GOING INTO SPRING. LARGE DATA CENTER JOB IN EASTERN HENRICO IS ONGOING & PAPERMILL IN HANOVER COUNTY. June 14, 2022; utpal parrikar education . CALLS ARE COMING IN VERY SLOW & NOTHING CURRENTLY GETTING INTO BOOK 2. THERE ARE 2 WATER TREATMENT FACILITIES IN SONORA & HUGHSON THAT ARE ONGOING, BUT HAVING THE SAME DIFFICULTIES WITH PARTS/MATERIALS. THERE IS ABOUT 250 BOOK 2 HANDS WORKING IN THE AREA, BUT OVERTIME CALLS HAVE SLOWED. CALL HALL FOR DETAILS., LOCAL HAS SLOWED SOME IN THE LAST 2 MONTHS & NOT MANY REQUESTS EXPECTED UNTIL MID-FEBRUARY. THAT JOB IS ANTICIPATED TO MAN UP SOON & WILL GET INTO BOOK 2 THRU THE SUMMER MONTHS, HOWEVER, MOST WILL BE WORKING 40/HR WEEKS. THE LARGE REMODEL PROJECT AT WAYNE HIGH SCHOOL HAS JUST STARTED & IS EXPECTED TO LAST 2 YEARS. LUCID MOTORS CASA GRANDE IS PAYING $75/DAY & WORKING 50/WEEKS WITH SOME SATURDAYS. NOTHING GOING INTO BOOK 2 AT THIS TIME. THE COAL TO DIESEL PLANT IN DALE IS STILL A GO, BUT UNCERTAIN OF A START DATE AT THIS TIME. THERE MAY BE A FEW MORE CALLS COMING IN FOR THE REFINERY JOB IN SUPERIOR, WI FOR NEWTRON ELECTRIC. LOCAL HAS BEEN STEADY IN THE AREA. LOCAL WILL NEED 25-50 MORE WIRMEN WITHIN THE NEXT 4-6 WEEKS IF DEADLINES REMAIN THE SAME. PROJECTS INCLUDE WORK AT TINKER AIR FORCE BASE, WIN STAR CASINO, STILLWATER MEDICAL CENTER, RARE EARTH PROJECT, WORK AT KONAWA POWER PLANT & WORK AT THE VA. LOCAL PROJECTING BOOKS TO BE UP TO 650 BY LATE JANUARY. CURRENT RED BADGE IS NOT REQUIRED & WILL BE GIVEN ON THE COMPLETION OF EPHQ & IN PROCESSING. Endless positives to working for local 72. THE STATE OFFERS TEST NOW THRU A 3RD PARTY RELATIVELY FREQUENTLY & HAVE REMOVED THE 90 DAY TEMPORARY LICENSE DUE TO THE OFFERING OF TESTING 6 DAYS A WEEK. WORK CONSISTS OF LARGE REMODEL AT LAMBEAU FIELD, CHEMICAL PLANT IN HOWARD, DIGESTER AT COMMERICAL DAIRY FARM IN GILLETTE (WORKING 5-10'S W/$50 A DAY PER DIEM PROVIDING 100% ATTENDENCE), VARIOUS BELMARK PAPER CONVERTING FACILITIES, MARINETTE MARINE & A FIRE DAMAGE PROJECT AT RESOLUTE PAPER IN MENOMINEE, MI THAT IS WORKING 6-12'S. BOOKS ARE MOSTLY CLEAR & GOOD BOOK TO SIGN. DISPATCH STARTS AT 8:30 AM & OFFICE IS OPEN 8:30AM TO 12PM & 1PM TO 5PM.CALL HALL FOR DETAILS. (12-16), DEFINED CONTRIBUTION PENSION (10.03%) & ANNUITY ($1.15), LOCAL IS STILL BUSY. LOCAL HAS QUITE A BIT OF WORK ON THE HORIZON, BUT SEVERAL SOLAR FARMS THAT WERE ANTICIAPTED TO START SOON HAVE BEEN DELAYED, POSSIBLE A YEAR, DUE TO SUPPLY & PANEL SHORTAGES. (12-6). NEBRASKA APPRENTICE LICENSE ARE AVAILABLE AT THE HALL FOR $23 GOOD FOR 1 YEARS SO LONG AS YOU HAVE NEVER HAD ONE PREVIOUSLY.CALLS ON THE COUNCIL BLUFF SIDE MUST HAVE IOWA STATE LICENSE OR UNCLASSIFIED LICENSE, STEEL TOED BOOTS, OSHA-10 WITHIN THE LAST 5 YEARS IN HAND & CURRENT DUES RECIEPT TO PICK UP REFERRAL. FORD BLUE OVAL BATTERY PLANT IN GLENDALE, KY WILL BE STARTING OUT AT 5-10'S & LIKELY 6-10'S WITH NO INCENTIVES AT THIS TIME.THIS PROJECT IS ANTICIPATING NEEDING 1000 ELECTRICIANS BY JULY OF 2023. EXPECTED TO NEED 25-50 WIREMEN A PEAK WITH A 2 YEAR DURATION ON THE PROJECT. Earn while you learn as an apprentice. % LOCALS BIG SOLAR & BATTERY STORAGE PROJECTS ARE NOT REQUIRING A STATE CERTIFICATION AT THIS TIME AND CALLS HAVE BEEN REGULARLY GOING IN TO BOOK 3. TRAINEE LICENSE OR CA STATE LICENSE REQUIRED ON ALL PROJECTS. FREQUENTLY ASKED QUESTIONS AND AVAILABLE JOB CALLS CAN BE FOUND AT, ON THE DROPS DOWNS UNDER THE REFERRAL TAB., LOCAL IS HOPING TO PICK UP GOING INTO 2023.. PROJECT INCLUDES CONVERTING AN OLD PHARMA BUILDING INTO A NEW PHARMA BUILDING IN MUSKEGON. CONTRACTORS ARE PICKING UP WORK. I hope that you agree using the contractors and members of UA Local Union 72 provides a value that cannot be matched in the plumbing, pipefitting and HVACR Service fields. FORD'S VISON OF ELECTRIC VEHICLE RESEARCH AND AUTOMATION CONTINUES IN DETROIT & DEARBORN WITH CONTINUED CONSTRUCTION ON THE VEC, R&E AND THE MICHIGAN TRAIN STATION. EXPECTED TO PICK UP AGAIN AFTER THE 1ST OF THE YEAR WITH MORE SHUTDOWNS COMING UP ALONG WITH SEVERAL OTHER PROJECTS. IT WILL CONTINUE TO RAMP UP THROUGH EARLY SUMMER AND PEAK AT ABOUT 500 ELECTRICIANS THROUGH LATE SUMMER 2024. MAZ DATA CENTER PAYING $8.00 OVER SCALE & WORKING 60 HR/WEEK SCHEDULE. LOCAL HAS SEVERAL SMALLER PROJECTS THAT WE WILL NEED HELP WITH AS WELL. THERE IS A OUTAGE AT PLANT HATCH COMING UP IN JANUARY AS WELL AS SOME WORK COMING AT THE GEORGIA PORTS.. THE COAL TO DIESEL PLANT IN DALE IS STILL A GO, BUT UNCERTAIN OF A START DATE AT THIS TIME. TURNAROUNDS ARE COMING WITH MANY OF THE CREWS WORKING OVERTIME. JOB IS WORKING 5-10'S AND AN 8 ON SATURDAY. 6 described in the UA Ritual, have a general supervisory control over all matters pertaining to the welfare of Local 72 and be ex-officio over all committees. THERE IS ALSO A VA SUPER HOSPITAL IN TOWN.CALL HALL FOR DETAILS.(1-23), CHARLOTTE, NC OFFICE - (704) 455-4595 , WILLIAMSTON, SC OFFICE - (704) 455-4595 EXT 207 OR 211, HICKORY, NC OFFICE - (704) 455-4595 EXT 208 OR 213, WORK HAS SLOWED DOWN. BENEFITS PYRAMID & ARE PAID OFF OF HOURS PAID, NOT HOURS WORKED. THE SCORPION (MANHATTAN VACCINE) PROJECT HAS BEEN PUSHED OFF 6 MONTHS. THERE ARE A LOT OF HOTELS WITHING 20 MINUTES OF THE BULK OF THE WORK IN THE JURISDICTION. ANTICIPATING NEEDING 75 HANDS FROM ALL CLASSIFICATIONS. endobj GRAND GULF NUCLEAR STATION SHUTDOWN. ROSENDIN FINISHED UP A 120 MW CALLED GASKELL & IS CURRENTLY BUILDING A 300 MW CALLED SANDRINI THAT IS LOCATED JUST SOUTH OF TOWN THAT IS EXPECTED TO LAST UNTIL JULY, PAYING $15/DAY SUBSISTENCE (ZONE 1). 4 0 obj CALLS GOING TO LAS VEGAS STRIP PROJECTS UNFILLED. VINEYARD WIND DELAYED ANOTHER YEAR. CALL HALL FOR DETAILS., LOCAL HAS SLOWED IN MOST ALL AREAS IN THE STATE OF ALASKA & IN THE FAIRBANKS & SOUTHEAST AREAS. THERE ARE CURRENTLY 20 WIREMEN ONSITE & EXPECTED TO INCREASE TO 100 WIREMEN BY THE END OF OCTOBER. FIELD OF DREAMS PROJECT ALSO ANTICIPATED TO TAKE OFF IN THE SPRING AS WELL AS A CASINO REMODEL THAT SHOULD TAKE OFF AFTER THE 1ST OF THE YEAR. WORK IS STEADY IN THE AREA. CSI ELECTRIC HAS AN 18 MONTH BIO-PHARMACEUTICAL PROJECT THAT IS ALSO ANTICIPATED TO BE REQUESTING MANPOWER BY MID-FEBRUARY AS WELL. THE NEXT WILL BE AT CUMBERLAND CITY & WILL START AT THE END OF SEPTEMBER & EXPECTED TO LAST ABOUT 75 DAYS WORKING OVERTIME AS WELL. WORK ANTICIPATED TO CONTINUE THROUGH JULY 2022. MAY BE CALLS FOR OTHER JOBS IN THE AREA AS WELL. CALL HALL FOR DETAILS. WORK EXPECTED TO PICK UP AGAIN GOING INTO 2023. CALL HALL FOR DETAILS., STATE LICENSE USUALLY REQUIRED BUT NON-JOURNEYMEN LICENSES ARE AVAILABLE WITHOUT TESTING, WORK IS STEADY IS STILL STEADY IN THE AREA. THERE ARE ALSO SCATTERED CALLS FOR OTHER WORK IN OTHER PARTS OF THE JURISDICTION. THERE ARE A COUPLE OF LARGE SOLAR FIELDS THAT WILL NEED HELP OVER THE NEXT SEVERAL MONTHS. JURISDICTION EXPECTED TO CONTINUE TO HAVE WORK THROUGHOUT THE END OF THE YEAR. CALL HALL FOR DETAILS. Among UA Local Union 72s current active membership there are a combined 15,394 current certifications in place! JOB IS CURRENLY WORKING 4-10'S M-T WITH 8 HRS OVERTIME ON FRIDAY & PAYING $100/DAY INCENTIVE PAY. ST LUCIE NUCLEAR PLANT EXPECT TO HAVE WORK AFTER THE NEW YEAR. GOING INTO 2023, THERE IS A FEW LARGER PROJECTS STARTING UP THAT LOOKS PROMISING GOING FORWARD.MUST HAVE COLORADOSTATE LICENSE.CURRENT TRAVEL LETTER & PAID UP DUES RECEIPT REQUIRED TO SIGN OUT OF WORK BOOK. LOCAL IS BUSY WITH OPEN CALLS AT THIS TIME. ALBAUGH CHEMICALS IS ALSO ADDING ON & THAT IS EXPECTED TO BE A GOOD SIZED PROJECT AS WELL AS SOME OTHER SMALLER 10-15 MAN JOBS AROUND THE AREA. ST LUCIE NUCLEAR PLANT EXPECT TO HAVE WORK AFTER THE NEW YEAR. THREE PROJECTS TOTALLING 720 MW OF SOLAR THAT SHOULD BE PLACING CALLS BY MID-SEPTEMBER. BP DOES HAVE TAR WORK, BUT WON'T START UNTIL SUMMER.CALL HALL FOR DETAILS. EARLIER THIS YEAR, THEY BROKE GROUND ON 2 NEW BUILDINGS KEEPING 350-450 WIREMEN BUSY. LOOKING AT POSSIBLE WORK COMING AT CHEMICAL PLANTS IN CALVERT CITY, KY THIS SPRING THAT SHOULD ALSO NEED HELP FROM BOOK 2. THERE IS ALSO NEW BUILDINGS/ADDITIONS TO THE CAMPUS OF ILLINOIS STATE UNIVERSITY UNIVERSITY AND HEARTLAND COMMUNITY COLLEGE THAT WILL BE STARTED GOING INTO THE FALL. ADMAN ELECTRIC OUT OF CHATTANOOGA, TN & R/S HAS FED EX PROJECT IN PITTSBURG, KS. CALL HALL FOR DETAILS. FAXSIGN IN REQUIRES CURRENT TRAVEL LETTER THAT MUST BE NOTARIZED WITH INITIATION DATE, CARD #, FULL SS #, STATE YOU HAVE 8000 HRS IN THE TRADE & DATE DUES ARE PAID THRU ALONG WITH A PAID UP DUES RECEIPT. (10-4), DEFINED ($2.65) & CONTRIBUTION/401K ($1.49), LOCAL IS BUSY & NEEDS HELP! OTHER LOCAL WORK MOSTLY 40/HRS. HOPE TO PICK UP INTO THE SUMMER MONTHS. EXPECT TO PICK UP AGAIN GOING INTO THE SPRINGS MONTHS. R.I.C.E. THEY ARE ALSO PAYING AN ADDTIONAL $100/DAY. AWAITING ANNOUNCMENT OF BATTERY PLANT, ANTICIPATING SPRING START. EXPECTED TO PICK UP AGAIN AFTER THE 1ST OF THE YEAR WITH MORE SHUTDOWNS COMING UP ALONG WITH SEVERAL OTHER PROJECTS. That number is up from the $2.6 billion the company earned in 2021. EXPECTED TO LAST UNTIL THE END OF THE YEAR.CALL HALL FOR DETAILS.(7-31), WORK IS STILL SLOW IN THE AREA. GAS POWER PLANT ON THE HORIZON IN HARRISON COUNTY WITH OWNER ADVANCED POWER. BLU ALLIANCE & CONTRA COSTA HAVE WORK AT THE REFINERIES IN TOWN & HAVE BEEN WORKING STEADY 5-10'S SCHEDULE WITH CALLS COMING IN FREQUENTLY. SEVERAL AMAZON PROJECTS HAVE BEEN DELAYED. BOTH HAVE STARTED BUT NEITHER EXPECTED TO REALLY GET GOING INTIL SPRING. ELECTRIC CITY & VARIOUS LOCAL JOBS WITH DIFFERENT CONTRACTORS. (12-6), CHECK LINK FOR INFO: www.public.psiexams.com, JOBLINE - (404) 523-8100 OR (800) 526-1064, LOCAL HAD A LARGE CONTRACTOR CLOSE IT'S DOORS & ABOUT 358 WIREMEN LOST THEIR JOBS. NOT MUCH EXPECTED TO GET INTO BOOK 2 FOR THE NEXT MONTH OR SO AS LOCALS FILL REMAINING JOB CALLS IN THE AREA. OTHER WORK IN THE AREA INCLUDES AMAZON, CLEVELAND CLIFFS, AEP DRESDEN, AMG ZANEVILLE AND OWENS CORNING. YOU CAN HAVE YOUR LOCAL REFERRAL OFFICE EMAIL SIGN YOU ONTO OUR BOOK 2. CALL HALL FOR DETAILS.(1-23), JOBLINE - (574) 287-8655 OR (800) 986-1054, LOCAL 153 IS STEADY!THERE ARE NUMEROUS OPEN CALLS FOR TELECOMMUNICATIONS. THE STELLANTIS/SAMSUNG BATTERY PLANT IN KOKOMO IS STILL ON TRACK. NO LARGE PROJECTS TO SPEAK OF, BUT ENOUGH SMALLER ONES TO KEEP BUSY. TAFT ELECTRIC EXPECTED TO BE HIRING 10-15 WIREMEN BY THE END OF MARCH & ROSENDIN ELECTRIC ANTICIPATED TO BE HIRING JUNE THRU OCTOBER NEEDED APPROX. JOBLINE - (715) 878-4068. DL SMITH WAS SUCESSFUL ON THE DOCKING BUILDING IN TOPEKA, BUT IT IS HIGHLY DOUBTFUL THEY WILL BE HIRING ANYTIME SOON. CALL HALL FOR DETAILS.(11-10), JOBLINE - (804) 355-1500 OR (800) 572-9221, DEFINED CONTIBUTION PENSION (21.7% OR $7.29) & ANNUNITY (3%), H&W = $23.5 % ($7.89), CALLS HAVE SLOWED IN THE JURUSDICTION. DEFINED CONTRIBUTION ($5.50) & NECA ($6.00) TVA. CALL HALL FOR DETAILS.(4-2), LP PLANT JUST MANNED UP WITH ABOUT 25 TRAVELERS WORKING 5-10'S & AN 8, BUT IS EXPECTED TO GO 6-10'S SOON. HALL SHOULD HAVE MORE INFORMATION FOLLOWING THE HOLIDAYS.(12-8), AREA HAS HAD CONTINUOUS OPEN CALLS FOR 5 LOCAL CONTRACTORS WITH AN AVERAGE OF ABOUT 20 OPEN CALLS DAILY THAT ARE WORKING FROM 40 HR/WEEKS TO 60 HR/WEEKS DEPENDING ON LOCATION. STILL A FEW CALLS TRICKLING FOR TOYOTA/MAZDA, MOST WORKING 40 HRS. LOCAL HAS A PLA IN SANTA BARBARA WITH THE 1ST PROJECT, A LIBRARY, OUT FOR BID NOW. WORK INCLUDES MASSIVE 750 MILLION DOLLAR PROJECT WITH A 3 YEAR TIMELINE & A BILLION DOLLAR PRICETAG. BOTH PROJECTS HAVE VOICED THEIR CONCERNS ON MANPOWER FOR THEH FUTURE EXPANSION OF BUILDINGS ON THEIR SITES. LOCAL CONTINUING TO WORK ON SEVERAL PLA'S WITH MULTIPLE PROJECTS UNDER THEM AND HAVE SOME SCHOOL PROJECTS STARTING IN LATE SPRING. R/S ELECTRIC HAS WORK AT GREENIES PLANT, KELLOGG'S, BAYER CROP SCIENCE, KAWASAKI & PRECAST WORK IN BOONEVILLE & SEVERAL OTHER PROJECTS ON THE EASTERN SIDE OF THE JURISDICTION. (10-4), WORK IS GOOD & LOCAL HAS BEEN VERY BUSY THE LAST FEW MONTHS. (10-14), 445 BATTLE CREEK, MI-(269) 964-4545, DEFINED ($7.80) & CONTRIBUTION PENSION ($5.50), WORK HAS BEEN SLOW IN THE AREA. THERE ARE A LOT OF OTHER 40 HR WORK AROUND THE AREA AS WELL. TRAVELERS SHOULD EXPECT A PRE-EMPLOYMENT DRUG TEST, DOCUMENTED OSHA 10 OR OSHA 30 TRAINING AND A STATE OF WI ELECTRICAL LICENSE. (12-16), JOBLINE - (406) 248-9110 OR (888) 532-4710, DEFINED ($3.02) & DEFINED CONTRIBUTION ($2.39), DEFINED ($2.07) & DEFINED CONTRIBUTION ($2.65), WORK HAS SLOWED DOWN SOME THE LAST FEW WEEKS. NEWTRON IS ON THE TVA COLBERT SIMPLE CYCLE PROJECT IN TUSCUMBIA, AL. LOCAL HAS QUITE A BIT OF WORK ON THE HORIZON, BUT SEVERAL SOLAR FARMS THAT WERE ANTICIAPTED TO START SOON HAVE BEEN DELAYED, POSSIBLE A YEAR, DUE TO SUPPLY & PANEL SHORTAGES. THERE IS A COMBUSTION CYCLE PROJECT GOING ON AT TVA PARADISE STEAM PLANT THAT IS WORKING 5-10'S. INFORMATION ON CA LICENSE OR HOW TO OBTAIN TRAINEE LICENSE AVAILABLE ON LOCAL'S WEBSITE.ACCOMMODATIONS ARE HARD TO COME BY IN THE AREA, SO PLEASE PLAN ACCORDINGLY!(12-16), WORK REMAINS SLOW IN THE AREA. OFFICE CLOSE 12:30PM TO 1:30 PM. A PAID DUES RECEPT GETS YOU ON THE BOOKS.(10-5), DEFINED ($6.37) & CONTRIBUTION PENSION ($5.11), LOCAL IS HOLDING IT'S OWN AT THIS TIME. ANTICIPATING TO BE HIRING SOON. THE BIG MEAT PROCESSING PLANT IS IN SITE PREPARATION PHASE & THE GM SHUTDOWN IS SCHEDULED TO START DECEMBER 17TH. CALL HALL FOR DETAILS. CA STATE CERTIFIED PREFERRED, BUT MAY TAKE A TRAINEE CARD IF EXPERIENCED IN BATTERY. CALL HALL FOR DETAILS.(12-16), DEFINED BENEFIT PENSION CONTRIBUTION $10.05, WORK OUTLOOK REMAINS VERY STRONG. HALL SHOULD HAVE MORE INFORMATION FOLLOWING THE HOLIDAYS. LOCAL IS CURRENTLY ALLOWING INITIAL BOOK SIGNING THROUGH FAX FROM HOME LOCAL WITH A CURRENT TRAVEL LETTER.(1-10), LOCAL IS STILL BUSY. HALL FOR DETAILS.(6-10), STATE LICENSE REQUIRED OR $25 WORKING PERMIT AVAILABLE, CONTRIBUTION PENSION (12.5%), WORK IS STEADY IN THE AREA. THERE ARE A COUPLE OF PROJECTS SCHEDULED TO START SOON. PLEASE REMEMBER A CURRENT DUES RECEIPT IN ORDER TO SIGN THE BOOK. ONE OF THEM IS IN ZONE A ($48.20/HR) AND ONE IS IN ZONE B ($63.80) WITH A DURATION OF ABOUT 10 MONTHS ON THESE PROJECTS.DAGGETT SOLAR PROJECT IS ABOUT PEAKED MANPOWER AT 350 WIRMEN WITH ABOUT 2 YEARS LEFT ON THIS 650 MW. UA 63 Welder: UA 63 Welder: UA 63 Welder: 2 UA 63 Welders starting at 6am on March 8th working 5/8s and 5/10s for 6 weeks then move to 7/10s and 7/12s for outage. (Source: Nectafy) MOST CALLS REQUIRES OSHA 10 & SECURE FIT EXAM WILL BE REQUIRED. P1 CONSTRUCTION HAS WORK AT HILLS DOG FOOD PLANT IN TONGANOXIE, KS & HOPE TO BE HIRING IN FEBUARY. GLASS PLANT SHUTDOWN & WORK AT REFINERY ONLY CALLS COMING IN FOR LOCALS AT THIS TIME. THESE REWABLE PROJECTS HAVE STARTED WITH BOTH WORKING 6-10'S AT THIS TIME. CSI ELECTRIC HAS AN 18 MONTH BIO-PHARMACEUTICAL PROJECT THAT IS ALSO ANTICIPATED TO BE REQUESTING MANPOWER BY MID-FEBRUARY AS WELL. CALL HALL FOR DETAILS.(1-10), DEFINED ($3.42) & CONTRIBUTION PENSION ($4.49), WORK IS STARTING TO PICK UP SOME FOR LOCALS AS COVID RESTRICTIONS ARE LIFTED. IT'S A PLA JOB UNDER AMES CONSTRUCTION THAT IS CURRENTLY WORKING AN UNSCHEDULED 6-10'S, BUT WILL GO TO SCHEDULED OVERTIME SOON. HOPE TO PICK UP SOME GOING INTO THE SPRING. THE PROJECT HAS STARTED & CONTRACTOR WILL BE PLACING MANPOWER CALLS AS NEEDED. HARRAH'S/CAESAR'S HOTEL TOWER HAS BEEN AWARDED TO FRISCHHERTZ ELECTRIC, BUT HASN'T BROKE GROUND YET. EXPECTED TO LAST ABOUT A YEAR & A HALF DURATION. CALL HALL FOR DETAILS. WORK IS STILL SLOW & NOT LIKELY TO CHANGE ANYTHIME SOON. ZONE(1) PROJECT COMING SOON:, ALLISON-SMITH 24-STORY LUXURY APARTMENT COMPLEX IN CHARLOTTE. OUR JOBLINE NUMBER IS651-776-4239. LP PLANT JUST MANNED UP WITH ABOUT 25 TRAVELERS WORKING 5-10'S & AN 8, BUT IS EXPECTED TO GO 6-10'S SOON. FACBOOK IS STILL ONGOING & HAS YEARS LEFT ON IT. HIRING SHOULD START IN MARCH ON THE NEW DIAMOND PET FOOD PLANT IN RUSHVILLE IN. LIGHT INDUSTRIAL WILL INCLUDE CARGILL & HUHTIMAKI. Why choose a Local Union 72 journeyman worker? CALL HALL FOR DETAILS. R.I.C.E. CALLS DO REQUIRE A DRUG TEST, BACKGROUND CHECK, FIT FOR DUTY, STEEL TOED BOOTS & OSHA 10 WITHIN THE LAST 5 YEARS. CALL HALL FOR DETAILS.(7-28), DEFINED ($5.85) & CONTRIBUTION PENSIONS ($6.90), LOCAL IS SLOWING DOWN AT THIS TIME. THERE IS A LARGE SOLAR PROJECT COMING THE 3RD QUARTER OF THIS YEAR THAT MAY NEED HELP AT THAT TIME. THAT ALONG WITH THE WORK AT THE DATA CENTERS SHOULD GENERATE A LOT OF WORK FOR LOCAL MEMBERS AS WELL AS TRAVELING BROTHERS & SISTERS.WHEN THE CALLS ARE LISTED AS "JW ELECTRICAL LICENSE" IT MUST BE A CLASS A LICENSE. FIELD OF DREAMS PROJECT ALSO ANTICIPATED TO TAKE OFF IN THE SPRING AS WELL AS A CASINO REMODEL THAT SHOULD TAKE OFF AFTER THE 1ST OF THE YEAR. CALL HALL FOR DETAILS., WORK IS STEADY IN THE AREA. EXPECTED TO START MANNING UP AGAIN LATE WINTER/EARLY SPRING 2023. EXPECTED TO BE BUSY GOING INTO THE NEXT MONTH & WILL CLEAR MOST OF THE LOCAL BOOKS & MAY HAVE SOME WORK FOR TRAVELERS THIS SUMMER, BUT NOT ANTICIAPTING TOO MANY.CALL REQUIRE A MICHIGAN STATE LICENSE. <>>> MUST INCLUDE NAME ADDRESS, CARD NUMBER, PHONE NUMBER, LOCAL UNION REQUIRED IN THE EMAIL.(9-18), WORK HAS SLOWED IN THE AREA. THE CHIP PLANTS ARE WORKING 60-60-50 SHIFTS. JOB CALLS ARE POSTED ON OUR WEBSITE. , NOT A LOT GOING ON IN FLINT RIGHT NOW & WORK IS STILL SLOW IN THE AREA. INITIAL SIGN IN VIA EMAIL. SOMECALLS DO REQUIRE A ST JOSEPH CITY LICENSE.CALL HALL FOR DETAILS. THE MAINTENANCE SIDE IS $41.21 & CONSTRUCTION SIDE IS $41.40. ALOS TALKS OF SOME OTHER VERY LARGE JOBS COMING LATER IN 2023 AT IOWA ARMY AMMUNITIONS PLANT IN MIDDLETOWN THAT IS EXPECTED TO LAST INTO 2026, AS WELL AS A MAINTENANCE SHUTDOWN NEXT SUMMER AT THE IOWA FERTILIZER PLANT IN WEVER.CALL HALL FOR DETAILS. THE CALLS FOR NO LICENSE ARE UNPREDICABLE AT BEST, BUT THEY DO EXIST ON OCCASION. REFINERY WORK IS COMPLETE & IS BACK ONLINE. NOT EXPECTED TO GET INTO BOOK 2 THROUGH THE WINTER MONTHS. ALL HALL FOR DETAILS. 14 EAU CLAIRE, WI - (715) 878-4068. THERE IS ANOTHER 500 MW PLUS A 250 MW BATTERY STORAGE.CONTRACTORS DOING THE LARGE SCALE SOLAR PROJECTS IN THE DESERT ARE REQUIRING THE STATE CERTIFICATION REQUIREMENTS.CALLS REQUIRE A CALIFORNIA STATE LICENSE. LOW VOLTAGE CALLS GOING DEEP INTO BOOK 2. THERE ARE 2 SOLAR PROJECTS, ONE IN CASSVILLE, WI & A LARGER ONE IN POTOSI, WI. CALL HALL FOR DETAILS.(6-24), DEFINED ($6.90) & CONTRIBUTION PENSION ($12.65), WORK HAS SLOWED IN THE AREA & EXPECTED TO REMAIN THAT WAY THROUGH THE 1ST OF THE YEAR. SEVERAL UPCOMING PROJECTS OUT OF BID INCLUDING WALMART HOME OFFICE IN BENTONVILLE, FLINT CREEK POWER PLANT IN GENTRY, CASINO IN RUSSELLVILLE, AMAZON & NANTZE IN BENTONVILLE. THAT JOB IS ANTICIPATED TO MAN UP SOON & WILL GET INTO BOOK 2 THRU THE SUMMER MONTHS, HOWEVER, MOST WILL BE WORKING 40/HR WEEKS. CHECK LOCALS WEBSITE FOR MORE INFORMATION.NO STATE LICENSE REQUIRED UNLESS WORKING WITHIN THE CITY LIMITS.